MIL-STD-1798C APPENDIX A
TABLE A-IV. Component Development and Systems Functional Tests Task Completion Criteria - Continued.
Program Milestone |
A |
B |
C |
|||||
Acquisition Phase |
Technology Development |
System Development and Demonstration |
Production and Deployment |
Operations and Support |
||||
Reviews and Audits |
SRR |
SDR(SFR) |
PDR |
CDR |
FRR(IFR) |
SVR |
PCA |
|
MECSIP TASK |
TASK IV Component Development and Systems Functional Tests (5.4) |
|||||||
Thermal, environment, and loads survey (5.4.14) |
• Define initial environment |
• Update |
• Update |
• Update MECSIP report with actual values to establish baseline |
• Determine any significant changes due to usage and environment |
|||
Overspeed/overtemperature (5.4.15) |
• Test risk analysis • Test needs • Test plans • Component, rig tests designed |
• Component designs reflect accommodatio n of requirements |
• Component and subsystems testing completed |
• Analysis updated with component and subsystems data for those environments deemed critical to safety of flight |
||||
Maintainability/repairability demonstrations (5.4.16) |
• Manufacturing plan initiated • Baseline manufacturing process identified • Quality system used to produce parts and components Identified |
• Define initial manufacturing and quality system |
• Update manufacturin g and quality assessment |
• Implement manufacturing and quality planning |
• Finalize baseline inspection capability and reparability |
• Deviation and waiver tracking system established |
• Repair process controlled |
|
Acceptance Test Procedures (5.4.17) |
• Draft |
• Final |
86