MIL-STD-1798C APPENDIX A
TABLE A-III. Design Analyses and Development Tests Task Completion Criteria.
Program Milestone |
A |
B |
C |
||||||
Acquisition Phase |
Technology Development |
System Development and Demonstration |
Production and Deployment |
Operations and Support |
|||||
Reviews and Audits |
SRR |
SDR(SFR) |
PDR |
CDR |
FRR(IFR) |
SVR |
PCA |
||
MECSIP TASK |
TASK III Design Analyses and Development Tests (5.3) |
||||||||
Manufacturing Quality Assessment (5.3.1) |
• Initial assessment |
• Update |
• Update |
• Final |
|||||
Design analyses (5.3.2) |
• Analysis initiated • Component designs reflect accommodation of requirements • Preliminary design analysis initiated |
• Component designs reflect accommodation of requirements • Component failure mechanism assessment established |
• Design system used to finalize design • FMECA updated • FRACAS implemented |
• Analysis updated with subsystems test data for those environments deemed critical to safety of flight |
• Analysis updated and validated to provide identified flight limitations |
• Analysis updated with test data for all required operating environments • Reliability and maintainability predictions updated • FMECA updated • FRACAS updated • Maintenance publications validated |
• Mechanical subsystems monitored to provide basis for changes to operational hardware or upgrade programs |
||
Load analyses (5.3.2.1) |
• Initial |
• Update |
• Update |
• Update |
• Update |
• Loads/environmental spectra survey documented |
|||
Design stress/environment spectra development (5.3.2.2) |
• Initial |
• Update |
• Update |
• Update |
• Update |
||||
Performance and function sizing analyses (5.3.2.3) |
• Initial |
• Update |
• Update |
• Update |
|||||
Thermal/environmental analyses and tests (5.3.2.4) |
• Installed location environments established • Conduct initial analysis |
• Update installed location for subsystems equipment complete • Develop Environmental Criteria Document (ECD) |
• Update to analysis • Thermal profiles created for both ambient and operational transient conditions |
• Update |
• Update |
||||
Stress/strength analyses (5.3.2.5) |
• Initial |
• Update |
• Update |
• Update |
• Update |
||||
Durability analyses (5.3.2.6) |
• Initial |
• Update |
• Update |
• Update |
• Update |
||||
Damage tolerance analyses (5.3.2.7) |
• Initial |
• Update |
• Update |
• Update |
• Update |
||||
Risk-based analyses (5.3.2.8) |
• Initial |
• Update |
• Update |
• Update |
• Update |
81
For Parts Inquires call Parts Hangar, Inc (727) 493-0744
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business