MIL-STD-1798C APPENDIX A
TABLE A-IV. Component Development and Systems Functional Tests Task Completion Criteria.
Program Milestone |
A |
B |
C |
||||||
Acquisition Phase |
Technology Development |
System Development and Demonstration |
Production and Deployment |
Operations and Support |
|||||
Reviews and Audits |
SRR |
SDR(SFR) |
PDR |
CDR |
FRR(IFR) |
SVR |
PCA |
||
MECSIP TASK |
TASK IV Component Development and Systems Functional Tests (5.4) |
||||||||
Component and rig test descriptions (5.4.1) |
• Initial draft |
• Update |
• Finalized |
||||||
Testing risk mitigation (5.4.2) |
• Planning |
• Planning |
• Mitigation test start |
• Mitigation tests complete |
|||||
Hardware and systems rig testing (5.4.3) |
• Planning |
• Planning |
• Rig test start |
• Rig tests complete |
|||||
Hardware components (5.4.4) |
• Component tests complete |
||||||||
Reliability growth demonstration (5.4.5) |
• Reliability growth demonstration tests complete |
||||||||
Oil interruption and depletion (5.4.6) |
• Oil interruption and depletion tests completed |
||||||||
Component fit checks (5.4.7) |
• Component fit checks completed |
||||||||
Component qualification (5.4.8) |
• Component qualification tests completed |
||||||||
Vibration and dynamic response (5.4.9) |
• Test risk analysis • Test needs • Test plans • Component, rig tests designed |
• Component designs reflect accommodatio n of requirements |
• Component and subsystems testing completed |
• Analysis updated with component and subsystems data for those environments deemed critical to safety of flight |
• Vibration and dynamic response tests complete |