MIL-STD-1798C APPENDIX A
TABLE A-III. Design Analyses and Development Tests Task Completion Criteria - Continued.
Program Milestone |
A |
B |
C |
||||||
Acquisition Phase |
Technology Development |
System Development and Demonstration |
Production and Deployment |
Operations and Support |
|||||
Reviews and Audits |
SRR |
SDR(SFR) |
PDR |
CDR |
FRR(IFR) |
SVR |
PCA |
||
MECSIP TASK |
TASK III Design Analyses and Development Tests (5.3) |
||||||||
Electrical/optical cable maintainability (5.3.8.1) |
• Initial analysis |
• Analysis complete |
• Formal Qualification Tests and System Integration testing complete |
||||||
Ground handling (5.3.8.2) |
• Initial analysis |
• Analysis complete |
|||||||
De-Rating/up-rating (5.3.8.3) |
• Initial analysis |
• Analysis complete |
|||||||
PHM assessment (5.3.8.4) |
• Initial analysis |
• Analysis complete |
|||||||
Obtain OEM data (5.3.8.5) |
• Define level of data required for sustainment |
• Analysis complete |
|||||||
Flight Manual (5.3.9) |
• Initial draft Flt Manual |
• Flight Manual Complete |
|||||||
Create WUC Manual (5.3.10) |
• Initial draft WUC Manual |
• Obtain Data |
• WUC Manual complete |
||||||
Identify Technical Needs (5.3.11) |
• Yearly |
• Yearly |
• Yearly |
• Yearly |
• Yearly |
• Yearly |
• Yearly |
||
Update MECSIP Master Plan (5.3.12) |
• Update |
• Update |
• Update |
• Update |
• Update |
• Update |
• Update |
83