MIL-STD-1798C APPENDIX A
TABLE A-IV. Component Development and Systems Functional Tests Task Completion Criteria - Continued.
Program Milestone |
A |
B |
C |
|||||
Acquisition Phase |
Technology Development |
System Development and Demonstration |
Production and Deployment |
Operations and Support |
||||
Reviews and Audits |
SRR |
SDR(SFR) |
PDR |
CDR |
FRR(IFR) |
SVR |
PCA |
|
MECSIP TASK |
TASK IV Component Development and Systems Functional Tests (5.4) |
|||||||
Strength testing (5.4.10) |
• Test risk analysis • Test needs • Test plans • Component, rig tests designed |
• Component designs reflect accommodation of requirements |
• Analysis updated with subsystem test data for those environments deemed critical to safety of flight |
• Aircraft operating limitations established for full- envelope flight testing |
||||
Durability testing (5.4.11) |
• Test risk analysis • Test needs • Test plans • Component, rig tests designed |
• Durability life test plan established. |
• Component and subsystems testing completed • Analysis updated |
|||||
Vibration/dynamics/ acoustics tests (5.4.12) |
• Test risk analysis • Test needs • Test plans • Component, rig tests designed |
• Component designs reflect accommodation of requirements |
• Component and subsystems testing completed • Analysis updated |
|||||
Damage tolerance tests (5.4.13) |
• Test risk analysis • Test needs • Test plans • Component, rig tests designed |
• Component designs reflect accommodation of requirements |
• Component and subsystems testing completed • Analysis updated |
85