MIL-STD-1798C APPENDIX A
TABLE A-III. Design Analyses and Development Tests Task Completion Criteria - Continued.
Program Milestone |
A |
B |
C |
||||||
Acquisition Phase |
Technology Development |
System Development and Demonstration |
Production and Deployment |
Operations and Support |
|||||
Reviews and Audits |
SRR |
SDR(SFR) |
PDR |
CDR |
FRR(IFR) |
SVR |
PCA |
||
MECSIP TASK |
TASK III Design Analyses and Development Tests (5.3) |
||||||||
Vibration/dynamics/ acoustic analyses (5.3.2.9) |
• Initial |
• Update |
• Update |
• Update |
• Update |
||||
Material characterization tests (5.3.3.1) |
• Initial development of material characterization tests defined |
• Initial development of material characterization tests conducted |
• Update |
||||||
Design development tests (5.3.3.2) |
• Initial development tests defined • Test rationale, test planning developed, test risk identified |
• Initial component development tests conducted |
• Components and subsystems development tests completed and data provided to designers to update design environment |
• Update |
• Update |
||||
Flight Control Systems analysis and test (5.3.4) |
• Initial development tests defined • Test rationale, test planning developed, test risk identified |
• Initial component development tests conducted |
|||||||
Electromagnetic effects and lightning (5.3.5) |
• Initial development tests defined • Test rationale, test planning developed, test risk identified |
• Initial component development tests conducted |
• Ground test rig and component tests complete |
• Flight testing completed |
|||||
Software performance and testing requirements (5.3.6) |
• Initial development tests defined |
• Test rationale, test planning developed, test risk identified |
• Critical module tests complete |
• Formal Qual tests and software integration tests complete for safety- critical functions |
• All testing complete |
||||
Abnormal operation design margin (5.3.7) |
• Abnormal operating conditions defined |
• Test rationale, test planning developed, test risk identified |
• Test plan complete |
• Critical module tests complete |
|||||
Reliability and maintainability (5.3.8) |
• Initial analysis |
• Analysis complete |