MIL-STD-1798C
5.2.5 Supportability planning.....................................................................................21
5.2.6 Prognostic Health Monitoring (PHM) planning..................................................21
5.2.7 Initial Failure Modes Effects and Criticality Analysis (FMECA) .........................21
5.2.8 Initial Hazard Analysis (HA) .............................................................................21
5.2.9 Component classification .................................................................................22
5.2.10 Aviation-Critical Safety Items ...........................................................................24
5.2.11 Prevention of failure for Safety-Critical Parts....................................................24
5.2.12 Design criteria..................................................................................................25
5.2.12.1 Damage tolerance design concepts .................................................................25
5.2.12.2 Other design concepts .....................................................................................28
5.2.12.3 Design Criteria for in-direct failure mode effects...............................................29
5.2.12.3.1 Uncontained failure control ..............................................................................30
5.2.12.3.2 Components operating in a flammable zone ....................................................30
5.2.12.3.3 Components operating in a flammable fluid leakage zone ...............................30
5.2.12.3.4 Flammable fluid carrying line and wire harnesses............................................30
5.2.12.3.5 Electromagnetic compatibility...........................................................................30
5.2.13 Aerospace castings..........................................................................................30
5.2.13.1 Casting requirements.......................................................................................30
5.2.13.2 Guidelines for digital radiography (DR) inspections of castings........................30
5.2.14 Maintenance concepts .....................................................................................31
5.2.15 Electrical Wiring Interconnect System (EWIS) Design Actions, Task One
(See EWIS MIL-HDBK-525 for more details.)...................................................31
5.2.16 Product Integrity Control Plan ..........................................................................31
5.2.17 Identify Technical needs (Task II) ....................................................................32
5.2.18 Update the MECSIP Master Plan.....................................................................32
5.3 (Task III) Design Analyses and Development Tests.........................................33
5.3.1 Manufacturing and quality assessment. ...........................................................33
5.3.2 Design analyses...............................................................................................33
5.3.2.1 Load analyses..................................................................................................33
5.3.2.2 Design stress/environment spectra development.............................................33
5.3.2.3 Performance and function sizing analyses .......................................................33
5.3.2.4 Thermal/environmental analyses and tests ......................................................34
5.3.2.5 Stress/strength analyses..................................................................................34
5.3.2.6 Durability analyses...........................................................................................34
5.3.2.7 Damage tolerance analyses.............................................................................34
5.3.2.7.1 Damage tolerance inspections.........................................................................35
5.3.2.7.2 Damage tolerance action categories and guidance..........................................35
5.3.2.7.3 Fail-safe...........................................................................................................35
5.3.2.7.4 Slow damage growth .......................................................................................35
5.3.2.7.5 Leak before burst.............................................................................................35
5.3.2.7.6 Proof test analysis............................................................................................36
5.3.2.8 Risk-based analyses........................................................................................36
5.3.2.9 Vibration/dynamics/acoustic analyses..............................................................36
5.3.3 Development tests ...........................................................................................36
5.3.3.1 Material characterization tests..........................................................................36
5.3.3.2 Design development tests................................................................................37
5.3.4 Flight Control Systems analysis and test..........................................................37
5.3.4.1 Dynamic modeling (flight control) .....................................................................37
5.3.4.2 Failure detection and accommodation (flight control) .......................................37
5.3.4.3 Stability and response (flight control) ...............................................................37
v
For Parts Inquires call Parts Hangar, Inc (727) 493-0744
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business