MIL-STD-2042-2B(SH)
Step 3 - Perform one of the following steps:
a. Clean the end of the BOF tube with a wipe dampened with alcohol and blow dry as necessary. Slide a tube coupler onto the BOF tube and firmly seat it. Clean the tube coupler plug with a wipe dampened with alcohol and blow dry as necessary. Insert the tube coupler plug in the other end of the tube coupler and firmly seat it within the tube coupler. Apply an axial load of approximately 22 N (5 lbs) between the BOF tube and the tube coupler plug to verify that they are properly engaged into the tube coupler.
b. Clean the end of the BOF tube with a wipe dampened with alcohol and blow dry as necessary. Slide a tube end cap onto the BOF tube and firmly seat it. Apply an axial load of approximately 22 N (5 lbs) between the BOF tube and the tube end cap to verify that the BOF tube is properly engaged into the tube end cap.
2Jl-2 METHOD 2Jl
For Parts Inquires call Parts Hangar, Inc (727) 493-0744
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business