MIL-STD-2042-2B(SH)
1. SCOPE.
METHOD 2H1
BOF CABLE ENTRANCE TO EQUIPMENT VIA MCP
1.1 Scope. This method describes a procedure for BOF cable entry to fiber optic cable topology and other equipment through multiple cable penetrations (MCP) integral to the equipment being entered.
2. REQUIRED EQUIPMENT AND MATERIALS.
2.1 The equipment and materials in table 2H1-I shall be used to perform this procedure.
TABLE 2H1-I. Equipment and materials.
Description |
Quantity |
Safety glasses |
1 |
Ruler |
1 |
Tallow (Hevi-Duty/Nelson AA0099 or equal) |
As required |
Open end wrench (sized to fit wedgepack nut) |
1 |
Cable jacket stripping tool (NAVSEA DWG 6872811-08 or equal) |
1 |
Kevlar shears (NAVSEA DWG 6872811-16 or equal) |
1 |
3. PROCEDURE.
3.1 Safety Summary. The following safety precautions shall be observed:
a. Observe warnings and cautions on equipment and materials.
b. Never look into the end of a BOF tube. Always wear approved safety glasses when handling BOF tubes that may be connected to a pressure source.
3.2 Procedure.
Step 1 - Select MCP blocks in accordance with table 2H1-II.
2H1-1 METHOD 2H1
For Parts Inquires call Parts Hangar, Inc (727) 493-0744
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business