MIL-STD-2042-6B(SH)
B = P3 - P4
z4 - z3
Step 13 -Repeat steps 11 and 12 above for all the fibers in the optical fiber cable.
Step 14 -The optical fiber cable is considered satisfactory if the maximum measured attenuation for each fiber does not exceed the vendor's attenuation data by greater than 1 dB/km, or the maximum allowable attenuation specified in MIL-PRF-85045. (NOTE: If the maximum measured attenuation for a fiber exceeds the above values, the optical fiber cable may have been damaged.)
Step 15 -If the optical fiber cable is not going to be installed in a cableway within 14 days, end seal the optical fiber cable in accordance with Method 1A1 in Part 1 of this standard practice.
6B1-7
METHOD 6B1
For Parts Inquires call Parts Hangar, Inc (727) 493-0744
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business