MIL-STD-2042-1B(SH)
6. NOTES
(This section contains information of a general or explanatory nature that may be helpful, but is not mandatory.)
6.1 Intended use. The methods for cable end-sealing, cable repair, BOF cable splicing, and BOF cable furcation depicted in this standard practice are intended primarily for new construction; however, they are applicable for conversion or alteration of existing ships.
6.2 Issue of DODISS. When this standard practice is used in acquisition, the applicable issue of DODISS must be cited in the solicitation (see 2.2.1 and 2.3).
6.3 Standard method designation. To simplify the usage of this standard practice, an alphanumeric designation system was developed to identify and locate a given method. The methods were grouped together by function as follows:
Group A: Cable end sealing Group B: Cable jacket repair Group C: BOF cable splicing Group D: BOF cable furcation Group E: OFCC end sealing
Then the designation system was completed as follows:
1 B 1 - 2
Alternate procedure within method Method number within group Functional Group
MIL-STD-2042 Part Number
Thus, method 1B1-2 identifies the second alternate procedure within method 1 of group B in Part 1 (MIL-STD-2042-1) of MIL-STD-2042.
6.4 Subject term (key word) listing.
Component Connections Marking Penetrations Repair Selection
Storage and handling
Testing
6.5 Changes from previous issue. Marginal notations are not used in this revision to identify changes with respect to the previous issue, due to the extent of the changes.
Preparing activity: NAVY - SH
(Project SESS-0005)
12
For Parts Inquires call Parts Hangar, Inc (727) 493-0744
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business