MIL-STD-690D w/ CHANGE 1 |
||
CONTENTS |
||
PARAGRAPH |
PAGE |
|
5.3.4 |
Sublotting failure rate maintenance procedure, failure rates R and S (optional) |
17 |
5.3.4.1 |
Failure to meet overall "C" number |
18 |
5.3.4.2 |
Overall "C" number not exceeded |
18 |
5.3.4.3 |
Example of sublot calculation |
18 |
5.3.5 |
Details to be specified |
18 |
5.4 |
Procedure IV, Lot conformance FR inspection" |
19 |
5.4.1 |
Sampling plans |
19 |
5.4.2 |
Extended FR tests |
19 |
5.4.3 |
Action in case of failure |
19 |
5.4.4 |
Details to be specified |
20 |
5.5 |
Procedure for truncation of life test data |
20 |
6. |
NOTES |
21 |
6.1 |
FR level conversion |
21 |
6.2 |
Computation of the unit-hour requirement |
21 |
6.3 |
Computation of the true failure rate |
21 |
6.4 |
Subject term (key word) listing |
21 |
6.5 |
Changes from previous issue |
22 |
APPENDIX A
A.1 |
SCOPE |
28 |
A.1.1 |
Scope |
28 |
A.2 |
APPLICABLE DOCUMENTS |
28 |
A.2.1 |
General |
28 |
A.2.2 |
Government documents |
28 |
A.2.2.1 |
Specifications, standards, and handbooks |
28 |
A.2.3 |
Order of precedence |
28 |
A.3 |
QUALIFICATION |
28 |
A.3.1 |
Qualification at the initial FR level |
28 |
A.3.2 |
Extension of qualification to lower FR levels |
28 |
A.3.3 |
Maintenance of FR level qualification |
29 |
A.3.4 |
Verification of qualification |
29 |
A.4 |
LOT CONFORMANCE FR INSPECTION (WHEN SPECIFIED) |
29 |
A.4.1 |
Sampling plan |
29 |
A.5 |
GENERAL |
29 |
A.5.1 |
Failure criteria |
29 |
A.5.2 |
Duration of failure rate test |
30 |
A.5.3 |
Screening tests |
30 |
A.5.4 |
Accelerated FR tests and acceleration factors |
30 |
A.6 |
FR QUALIFICATION DATA |
30 |
A.6.1 |
Expanding FR sampling plan |
30 |
A.7 |
APPLICATION INFORMATION |
30 |
A.7.1 |
Reliability data |
30 |
vi
For Parts Inquires call Parts Hangar, Inc (727) 493-0744
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business