MIL-STD-2003A(SH)
5.2 MIL-STD-2003-2. This part includes detailed requirements for installation and mounting of electrical equipment to various types of bulkheads and decks, switchboards, battery racks, casualty power components, and shore power components.
5.3 MIL-STD-2003-3. This part includes detailed requirements for installation of stuffing tubes in submarines, stuffing tubes and multi-cable penetrations in surface ships, kickpipes and submarine pressure hull penetrations.
5.4 MIL-STD-2003-4. This part includes detailed requirements for cables associated with slack, bend radius, battle damage, general protection, heat, moisture, hazardous locations, installation and support in hangers, handling, marking, and spacing.
5.5 MIL-STD-2003-5. This part includes detailed requirements for cable lead preparation and installation of the following connectors: MIL-DTL-5015, MIL-DTL-22992, MIL-DTL-26482, MIL-DTL-27599,
MIL-DTL-28840, MIL-DTL-38999, and MIL-C-81511.
6. NOTES
(This section contains information of a general or explanatory nature that may be helpful, but is not mandatory.)
6.1 Intended use. This standard specifies the requirements for electric plant installation standard methods to be employed both on surface ships and submarines. Standard methods identified for electric plant installation are intended for new construction, conversion, and alteration of existing ships.
6.2 Acquisition requirements. Acquisition documents should specify the following:
a. Title, number, and date of this standard.
6.3 Designation of electric plant installation standard methods figures. Each of the parts of electric plant installation standard methods contains figures that depict standard methods that are applicable for general electric plant installation on both surface ships and submarines. The methods shown on the figures are grouped together providing similar functions. These groups are:
Part |
Group |
Title |
1 (Cables) |
A |
Cable Preparation and End-Sealing |
B |
Cable Entry to Equipment |
|
C |
Protection of Topside Connectors |
|
D |
Repair of Damaged Cable |
|
E |
Cable Splicing |
|
2 (Equipment) |
A |
Standard Methods for Mounting Equipment |
B |
Switchboard Mounting |
|
C |
Battery Rack Mounting |
|
D |
Casualty Power |
|
E |
Shore Power |
|
3 (Penetrations) |
A |
Penetrations - Stuffing Tubes, Submarines |
B |
Penetrations - Stuffing Tubes, Surface Ships |
|
C |
Penetrations - Stuffing Tubes, General |
|
D |
Penetrations - Kickpipes |
|
E |
Penetrations - Pressure Hulls, Submarines |
|
4 (Cableways) |
A |
Cableways (Submarines) |
B |
Cableways (Surface Ships) |
3